A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

4(t+25) = (t+50) - 4 (0.15t)
Help with civics homework?
Read lines 28 - 30 from the last stanza in the poem, labeled “Talking In Their Sleep.” “You will see me again - I shall laugh at you then, Out of the eyes of a
60 POINTSSS PLEASE HELPPPPP Fallen Leaves and Water Quality adapted from U.S. Geological Survey (USGS) Removing leaf litter does a lot more than make a ya
Which of the following are irrational numbers? 3.14 √ 5 0.3333 √ -4 1/9
The picture has the question and possible answers
Clark is alone in a cave and eager to leave it. Looking at his map of the cave (shown below), Clark sees that there is a special tunnel close to his current loc
What mean word bridal, wand, exclamation, muttered (i think this is like ,,H-He is a-a vam-vampire. Like a disablity to said the word, so you need to repeat som
¿Por qué el texto de Mario Vargas Llosa se llama la verdad de las mentiras?
Please help!! Only find total surface area and volume.