elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

what is the answer to 1+1
Select the most reasonable estimated answer. 748.36 – 297.78 a. 300 b. 350 c. 400 d. 450
Which of the following is a severe convective weather event that can occur when a warm, moist air mass meets a cold air mass? a. blizzard b. tornado c. dust
what is Florida's archipelago
At the middle school graduation dance,the DJ played 12 slow dances,which was equal to the quotient of the number of fast dances and 2
_____ occurs at convergent boundaries, where one layer of crust sinks into the asthenosphere when it collides with another layer of crust. Divergence Weathering
at summer camp the ratio of boy to girls was 7:1. If there were 63 boys, how many girls were there
is 0.02468 greater than 0.024
solve the equation: Show work step by step -14=-5+3c
How should you test a hypothesis?How should you test a hypothesis? by writing a mathematical equation by making a single observation by performing a controlled