nmartin7537 nmartin7537
  • 04-01-2021
  • Mathematics
contestada

It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

how to estimate, then find the sum of137,638 + 52,091
why did general MacArthur address congress after he was fired.?
What is 3.82 rounded to the nearest whole number
what is 24 tens equal to
What is the expanded form for 6.324
Is .634 rational number
A teacher is choosing 4 students from a class of 30 to represent the class at a science fair. In how many ways can the teacher choose the students?
There are 35 boys in sixth grade. The number of girls in the sixth grade is 42. Lonnie says that means the ratio of number of boys in the sixth grade to number
There are 21 students  in Mr.Tentlers  class The students divided themselves evenly  into 3 groups.how many  students  are in each  groups?
Solve for w: P=2L+2W