michelovessoccer michelovessoccer
  • 02-01-2021
  • Computers and Technology
contestada

When using a software budget, you should feel very confident if you choose a solution that looks like it will come in exactly on budget, without any overage costs.

a
True

b
False

Respuesta :

PrestonHedlund
PrestonHedlund PrestonHedlund
  • 02-01-2021

Answer:

probably false

Explanation:

because u dont want a budget to b exact u want it completely covered

Answer Link

Otras preguntas

Read the passage! He fought and argued, told dirty stories. He drank too much when he could get it, ate too much when it was there, talked too much all the ti
Why are ziggurat and polytheism linked ?
(01.01) Evaluate 12 − 6 + (14 − 8)2 = ____________. Numerical Answers Expected! Answer for Blank 1:
In projectile motion on Earth, the horizontal component of gravitational acceleration is
An effective chart helps to clarify understanding
After arriving in Jamestown, colonists were attacked by Native Americans within
Which of these animals is considered a model for punctuated equilibrium? a. whale b. ammonite c. Archaeopteryx
A water pump with a power of 3.4 × 102 watts lifts water at the rate of 7.5 × 10-2 meters/second from a water tank. What is the force exerted by the pump on the
HELP!! EASY POINTS!! If you put it in German, you will get brainliest, but it doesn't have to be. Imagine you’re a teacher and your classroom is really clutter
What are the prime factors of 700?