katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

An elevator is two floors below ground level and goes up five floors . write an addition equation that models the location of the elevator related to ground-l
Solve the equation -10 = 5g. Check your solution. g = -2 g = -50 g = 2 g = 50
2/3 (6e + 9f -21g) -7f
Where do many of ZOODOM's animals come from? the United States and Africa Lakes and Oceans Europe and Asia forests and mountains
What is the absolute magnitude of the sun?
The higher up on a cladogram animals are
What is the value of 8 squared? A. 16 B. 64 C. 82 D. 512
Are all these physical changes Tear Mix Squeeze Divide Cook
Which of the following represents the most accurate estimation of 30 - 18?
After taking notes carefully and studying freqently, Derek not only passed the test, _____. Select the word group below that BEST completes the sentence in pa