jessecornwell7 jessecornwell7
  • 02-04-2020
  • Computers and Technology
contestada

What element of a timeline helps to mark progress of the project?
O A. milestones
O B. job responsibilities
O C. external deliverables
OD. internal tasks

Respuesta :

Kekebad578
Kekebad578 Kekebad578
  • 02-04-2020
The answer is A.milestones
Answer Link

Otras preguntas

Read the sentences from "To Build a Fire": Any man who was a man could travel alone. But it was surprising, the rapidity with which his cheeks and nose were fre
Which is an effective way to resist peer pressure to do something you're uncomfortable doing?
When does the Narrative of Sojourner Truth take place? A. After the Civil War B. Right after the Emancipation Proclamation C. Before the Civil War D. During
what geographic feature has been most responsible for extensive trade throughout Europe
It is important for people with HIV/AIDS to keep their hands free from germs as much as possible because __________. a. AIDS can be transmitted through handshak
explain why 2.15 and-2.15 opposite
Hot dogs come in packs of 10 while bonds: packs of eight what are the least number is a fax you should buy in order to have the same numbers of hot dogs and bun
some people who didnt agree with the puritans were?
Which number is greater than 7.23 and less than 7.55? 7.59;7.17;7.6;7.3
Homo erectus is believed to be the first species found outside _____. Asia Europe Africa America