A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

What are some elements of the rainbow serpent that may match to existing snakes today?
what is the graph of the function f(x)=-x^2+4x+6/x+4
Based on what you know about nonverbal communication, describe all the different types of nonverbal messages being conveyed in these photographs and how the chi
What is 12% of 32? Please help.
, Stevens glass holds 40 milliliters of milk fairs holds 2/5 as much milk. How much milk does fairs hold
Approximately how many infants each year are born in the united states with fetal alcohol syndrome?​
How would a gummy bear placed in salt water be different from a gummy bear placed in regular water? A. The regular water gummy bear would be larger. B. They bot
What can prevent wind erosion?
How to solve 3/2 = 9/10k (in fraction form). Please show work
Hugo Chavez was reelected as president in 1998 to leave the country of...A.Cuba B.Colombia C.Venezuela D.Mexico