Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

12.5 divided by 0.25?
Round to the nearest dollar. ​$7,562.36
Kayson is looking at two buildings, building A and building B, at an angle of elevation of 40°. Building A is 120 feet away, and building B is 60 feet away. Whi
What is the slope of the line that contains the points (-1, 2) and (3, 3)?
What online game do you play on the internet and can I play with you on it? I play downtown mafia 1960
PLZ HELP ON THIS ASAP DUE SOON Why do you think it is important for our leaders to put the good of the country before their own political gain? Explain your ans
!!!!! HELP ME OUT PLS!!!
Find AC. Round to the nearest tenth.
Question 20 of 50 A person who believes in the divine right of kings would most agree with which statement? A. Even religious leaders should not criticize kings
Which expression is equivalent to 4c+ c- 2c?​