Jarelle123 Jarelle123
  • 02-07-2018
  • Mathematics
contestada

If a project will take 35 employees 2940 hours to complete how many hours will each employee have to work

Respuesta :

afrazi01p8qv5j
afrazi01p8qv5j afrazi01p8qv5j
  • 02-07-2018
To find out how many hours each employee will need to work, we divide 2940 hours by 35 to evenly split the hours among each of the workers.
2940 / 35 = 84
This means that each employee will need to put 84 hours of work into the project to complete it.

Answer Link

Otras preguntas

Describe the steps that resulted in the development of trench warfare
Whats the percent of fifty one hundredths.
How can you make an art critique appealing?
Bjorn is holding a tennis ball outside a second floor window (3.5 meters from the ground) and billie jean is holding one outside a third floor window (6.25 mete
What term references a period of economic growth as measured by a rise in the real GDP? A. trough B. recession C. expansion D. depression
origen y evolucion del sistema solar
a window is shaped like a parallelogram the base of the window is 27 inches its area is 445.5 square inches. what is the height of the window?
Place or object used for comparison to determine if something is in motion
Lisa's recipe for 6 dozen cookies has 3/4 cup of butter and 1 1/2 cups of sugar. How much butter does she need to make only 3 dozen cookies?
Describe nondisjunction and the effect it can have on a human